Completion of Maintenance Works at the Korinthos Power S.A. Power Generation Plant, part of the Metlen Group
C&A Stavros Kassidiaris S.A. recently completed a series of maintenance works at the facilities of Korinthos Power S.A., a 437 MW Combined Cycle Unit of the Metlen Group. The scope of work included:
- • Resistance and Insulation Resistance Measurements: Measurements were carried out on transformers, motors, and generator poles to ensure the optimal operational condition of the systems.
- • Equipment Cleaning: Cleaning was performed on transformers, motors, circuit breakers, and the generator to ensure their uninterrupted and efficient operation.
- • Inspection and Replacement of Sensors: Functionality checks were carried out on various sensors and measuring instruments. Where necessary, faulty sensors were replaced to ensure optimal system performance.
All work was carried out in collaboration with and under the guidance of the engineers at Korinthos Power S.A., ensuring compliance with the highest standards of quality and safety.